• ZESCO’s Arrears Status: MEL realized US$15 million from ZESCO, reducing outstanding arrears to US$13.4 million.
• MEL’s Phase II 300 MW project will be commissioned in phases by July 2027 having faced severe challenges associated with higher costs arising from the ongoing crisis in West Asia, impacting supply chains, vessel movements, container availability and delivery schedules of critical equipment.
• MEL remains well positioned to absorb the marginal increase in capex.
• Maamba Solar Energy Limited’s 100 MW solar project is set for commissioning by September 2026 when power flows and commercial revenues commence.

Re: Q1 Nava

Posté : sam. 15 août 2026 09:32
par mbury
Voilà l'explication de la mise en route beaucoup retardée de la 2ème tranche, sinon, tout le reste se déroule très correctement

Re: Q1 Nava

Posté : sam. 15 août 2026 10:08
par w@z@
Oui, les 100MV solaires produiront avant les nouveaux 300MV de l'extension.