Page 1 sur 1

Travaux d'amélioration à Ndola Lime

MessagePosté: Jeu 15 Juil 2010 18:08
de Clint
Ndola Lime Company Limited is a wholly owned subsidiary of ZCCM – IH. The Company is specialized in the mining of limestone products and is situated 16 Km south east of Ndola City.

Among the equipment it operates is a 500 tonne Vertical lime kiln. The kiln is fitted with a Sand Bed Filter for dust abatement. Currently the system is dysfunctional and de-commissioned.

The Company hereby undertakes to procure and install a dust abatement system to control dust emissions and meet the statutory compliance emission levels of less than 50mg/Nm^3

Prospective Bidders can download the tender document outlining the scope of work here.

Pour ceux que ça interesse ,voir sur le site pour télécharger le PDF du cahier des charges :

http://www.ndolalime.co.zm/index.php/tenders