At our Zambian operations, integrated cathode production was 34,000 tonnes during Q4, an increase of 26% over the corresponding prior quarter and 15% higher than the immediately prior quarter. Cathode production from custom smelting was 19,000 tonnes during Q4. Total cathode production in FY 2010 was 173,000 tonnes, 30% higher than the previous year.
The mid shaft loading station at the Konkola Deep Mine Project was commissioned in March 2010 as scheduled, resulting in an increase in the hoisting capacity of the mine. Construction work on the bottom shaft sinking is progressing on schedule, for completion by Q3 FY 2012.
Production Summary (Unaudited)
( in '000 tonnes, except as stated)
Quarter ended 31 March
Year ended 31 March
Particulars 2010 2009
Change 2010 2009
Copper - Zambia
Quarter ended 31 March
53 35 51.4%
Year ended 31 March
173 133 30.1%
Integrated
Quarter ended 31 March
34 27 25.9%
Year ended 31 March
127 108 17.6%
Custom
Quarter ended 31 March
19 8 137.5%
Year ended 31 March
46 25 84.0%