vedanta results Q1
· Record Q1 EBITDA, up 33% at US$ 1,055 million
· Refined Zinc production up 17% at Zinc-India
· Commenced commissioning of 100 ktpa Dariba lead smelter
· Aluminium production up 46% at Jharsuguda
Copper ― Zambia
Our integrated production during Q1 FY2011-12 was 3% higher at 35,000 tonnes as compared with the corresponding prior quarter. Production from the tailings leach plant was 16% higher at 13,000 tonnes. Total copper cathode production was 50,000 tonnes, as compared with 55,000 tonnes in the corresponding prior quarter, because production from custom smelting was lower by 6,000 tonnes due to limited availability of the appropriate blend of copper concentrate. Mined metal production was 24,000 tonnes, in line with the corresponding prior quarter.
EBITDA was significantly higher at US$ 131.8 million on account of higher LME prices and higher integrated production, partially offset by increases in wages and other input costs.
At KDMP, a significant milestone was achieved with the completion of sinking of Shaft 4 to its ultimate depth. At Nchanga, work on the new concentrators, the Upper Ore Body project, the TLP Debottlenecking project and the second cobalt recovery furnace is progressing as planned.