CHIBULUMA MINE RESUMES FULL PRODUCTION

<<

bingogo

Avatar de l’utilisateur

Administrateur du site

Messages: 4390

Inscription: Jeu 30 Juil 2009 16:48

Localisation: la seyne sur mer

Message Jeu 17 Sep 2009 12:07

CHIBULUMA MINE RESUMES FULL PRODUCTION

JOHANNESBURG, Sept 17 (Reuters) - Metorex Ltd:

# SAYS METOREX - CHIBULUMA MINE RESUMES FULL PRODUCTION AFTER BRIEF TEMPORARY
stoppage

# SAYS WAGE NEGOTIATIONS ARE CONTINUING
<<

bobded

Avatar de l’utilisateur

Messages: 2418

Inscription: Dim 30 Aoû 2009 21:22

Message Jeu 17 Sep 2009 22:28

Metorex resumes full production at Zambia copper mine

Metorex resumes full production at Zambia copper mine
By: Esmarie Swanepoel
17th September 2009

JOHANNESBURG (miningweekly.com) – JSE-listed diversified miner Metorex has resumed full output at its Chibuluma copper mine, after mining at the Zambia operation were temporarily halted this week, the company reported on Thursday.

It had suspended production at the mine on Tuesday, in the wake of wage negotiations, which were now continuing while the mine resumed production.

Chibuluma has a milling capacity of 50 000 t/m and the copper headgrade has improved as mining advanced through the waste parting present during the previous year and is expected to further increase with depth.

Chibuluma South is now a fully established mine with 4,7-million tons of reserve at an improving grade. Predevelopment of the decline shaft was progressing on schedule ensuring increased maximum mining flexibility.
Edited by: Mariaan Webb

Retourner vers About Chibuluma - Metorex

cron
Powered by phpBB - Designed by Vjacheslav Trushkin for Free Forums/DivisionCore - Traduction par: phpBB-fr.com